Nodes of different colours represent the following:
Solid arrows point from a parent (sub)module to the submodule which is descended from it. Dashed arrows point from a module being used to the module or program unit using it. Where possible, edges connecting nodes are given different colours to make them easier to distinguish in large graphs.
Nodes of different colours represent the following:
Solid arrows point from a procedure to one which it calls. Dashed arrows point from an interface to procedures which implement that interface. This could include the module procedures in a generic interface or the implementation in a submodule of an interface in a parent module. Where possible, edges connecting nodes are given different colours to make them easier to distinguish in large graphs.
Nodes of different colours represent the following:
Solid arrows point from a procedure to one which it calls. Dashed arrows point from an interface to procedures which implement that interface. This could include the module procedures in a generic interface or the implementation in a submodule of an interface in a parent module. Where possible, edges connecting nodes are given different colours to make them easier to distinguish in large graphs.
SUBROUTINE UpdatePrecipitation
! SUBROUTINE INFORMATION:
! AUTHOR B. Griffith
! DATE WRITTEN August 2006
! MODIFIED na
! RE-ENGINEERED na
! PURPOSE OF THIS SUBROUTINE:
!update the current rate of precipitation
!
! METHODOLOGY EMPLOYED:
! <description>
! REFERENCES:
! na
! USE STATEMENTS:
! na
USE ScheduleManager, ONLY: GetCurrentScheduleValue
USE DataGlobals , ONLY: SecInHour
USE DataHVACGlobals, ONLY: TimeStepSys
IMPLICIT NONE ! Enforce explicit typing of all variables in this routine
! SUBROUTINE ARGUMENT DEFINITIONS:
! na
! SUBROUTINE PARAMETER DEFINITIONS:
! na
! INTERFACE BLOCK SPECIFICATIONS
! na
! DERIVED TYPE DEFINITIONS
! na
! SUBROUTINE LOCAL VARIABLE DECLARATIONS:
REAL(r64) :: schedRate
REAL(r64) :: ScaleFactor
If (RainFall%ModeID == RainSchedDesign) then
schedRate = GetCurrentScheduleValue(RainFall%RainSchedID) ! m/hr
ScaleFactor = RainFall%DesignAnnualRain / RainFall%NomAnnualRain
RainFall%CurrentRate = schedRate * ScaleFactor / SecInHour !convert to m/s
RainFall%CurrentAmount = RainFall%CurrentRate* (TimeStepSys * SecInHour)
ENDIF
RETURN
END SUBROUTINE UpdatePrecipitation